Who we serve in Morocco
MASEN (Moroccan Agency for Sustainable Energy), ONEE (Office National de l'Electricité), OCP (phosphates), and EPC contractors serving the Noor solar complex and other renewables programmes.
Morocco's renewable energy programme is one of the largest in the world. MASEN's Noor solar complex, the wind farm build-out, and the green hydrogen pilots are all active procurement environments.
We support Moroccan buyers on solar and wind BoP equipment, industrial automation for OCP's phosphate processing, and HV transmission infrastructure for ONEE.
Equipment categories with strong stock and lead time in Morocco.
How equipment gets to your site.
- Casablanca Port
- Tanger Med
- Jorf Lasfar
- Mohammed V International Airport
- Casablanca
- Rabat
- Tangier
- Marrakech
- Jorf Lasfar
- Safi
Morocco customs duties typically 2.5–10%. Clearance through Tanger Med typically 5–10 days. Strategic projects (MASEN) benefit from preferential treatment.
Shipping options to Morocco
- · Sea freight to Tanger Med, Casablanca, Jorf Lasfar
- · Air freight to Casablanca (CMN) and Rabat (RBA)
We respond in
Our Morocco desk responds within one business day on average. For urgent inquiries outside business hours, message us on WhatsApp.
What buyers typically ask about Morocco.
How do I source genuine Siemens switchgear for a substation in Casablanca without local representation?+
You can engage an independent supplier like The Power Contractor that sources directly from Siemens authorized distributors in Europe or the UAE. Ensure the supplier provides a certificate of origin and warranty documentation. For EPC services, verify their experience with local grid codes and customs clearance in Morocco.
What are the lead times for ABB transformers shipped to Tangier Med port?+
Lead times typically range 12-16 weeks from order confirmation, depending on transformer rating and customization. An independent supplier can expedite by sourcing from regional stock in Europe or the Middle East. Confirm shipping terms (CIF Tangier) and ensure compliance with Moroccan electrical standards (NM IEC).
How do EPC contractors procure 33kV switchgear packages for projects in Marrakech?+
For 33kV switchgear installations in Morocco, a locally licensed EPC partner executes civil works and ONEE grid connection approvals while sourcing OEM switchgear internationally. Independent OEM suppliers like The Power Contractor supply genuine MV switchgear, protection relays, and FAT documentation shipped CIF Casablanca or Tangier Med in compliance with NM IEC standards.