Who we serve in Algeria
Sonatrach (and subsidiaries), Sonelgaz, AGEM, and the EPC contractors serving Algeria's upstream, midstream and downstream hydrocarbon sector.
Algeria's industrial procurement is dominated by Sonatrach and Sonelgaz. The country's mature hydrocarbon estate (Hassi Messaoud, Hassi R'Mel, the Arzew and Skikda industrial complexes) drives steady demand for process equipment, instrumentation, and electrical balance of plant.
We support Algerian buyers across upstream, midstream and downstream — and on Sonelgaz transmission and distribution infrastructure.
Equipment categories with strong stock and lead time in Algeria.
How equipment gets to your site.
- Algiers Port
- Oran Port
- Skikda Port
- Arzew Port
- Annaba Port
- Houari Boumediene Airport
- Algiers
- Oran
- Skikda
- Arzew
- Hassi Messaoud
- Hassi R'Mel
Algeria customs duties typically 5–30% depending on HS code. Clearance can take 10–20 days. Industrial-project items often qualify for reduced duties.
Shipping options to Algeria
- · Sea freight to Algiers, Oran, Skikda, Arzew
- · Air freight to Algiers (ALG)
- · Bonded transport to project sites
We respond in
Our Algeria desk responds within one business day on average. For urgent inquiries outside business hours, message us on WhatsApp.
What buyers typically ask about Algeria.
How to source genuine Siemens circuit breakers for a substation upgrade in Algeria?+
For substation upgrades in Algeria, specify the exact catalog number and request a certificate of origin. We source directly from Siemens-authorized manufacturers and provide full traceability. Delivery timelines depend on customs clearance at Algiers port. Contact us with your project specifications for a technical review.
What are the lead times for ABB transformers delivered to Oran?+
Lead times for ABB transformers to Oran typically range from 12 to 16 weeks, depending on the rating and configuration. This includes manufacturing, export consolidation from our China hubs (Nanjing, Shanghai, Ningbo), shipping, and customs clearance. We recommend ordering with a 20-week buffer for large power transformers and can expedite dispatch when factory-allocated stock is available.
Can you supply OEM equipment packages for a 220kV substation or transmission project in Algeria?+
Yes, we supply genuine OEM primary and secondary electrical equipment packages for 220kV substation and transmission projects in Algeria. While local civil and installation works are executed by the buyer's appointed EPC contractor, we supply switchgear, protection relays, and instrumentation aligned with Sonatrach and Sonelgaz specifications with French, Arabic, and English documentation.